The preparation of the GCA report is completed. Currently, only the BOD5 monitoring report of the electricity generation domestic sewage in 2019 is missing.
GCA report completed, currently only lack of 2019 electric domestic sewage BOD5 monitoring report, has been commissioned by a third party Jiangsu National Sampling Testing
The GCA report has been prepared, and only the BOD5 monitoring report of domestic sewage produced by electric power generation in 2019 is missing, and the third party Jiangsu national survey sampling test has been entrusted on 1 / 9<br>